Nacala Integrated Logistics Corridor Launched (Vale)

We started in this project with one mechanical site engineer and one electrical site engineer for Sandvik Mining. After 3 Month MCI began also with the Site Management for this Project in name of Sandvik. We build 2 Stacker with a theoretical capacity from approx. 6.500 To/H and 2 Reclaimer with the same capacity. We took over the whole responsibility in the mechanical and electrical supervision for the Erection, the Commissioning with the Automation, the Operator Training, hand over to the client and the contact to the Client VALE.

Sandvik decided MCI because of our very good relationship over the last years due to a lot of successful projects together. In 2016 the project was finished with a satisfactory of the client. Jobs and results like this are our passion and give us potential to move forward and grow.

Facts:
2 pic Reclaimer
2 pic Stacker
Material: Coal

Scope of work

Commissioning
Ramp up and Performance testing
Training of Operators
Erection
Site Management and control
Automation of machinery
Quality Management and Assurance