Project nr 28

Nacala Integrated Logistics Corridor Launched (VALE)


Africa Mozambique

Scope of work

Site Management and control
Erection
Automation of machinery
Commissioning
Training of Operators
Ramp Up and Performance Testing
Quality Management and Assurance

schedule

2014-2016

Fakten

  • 2 pic Reclaimer
  • 2 pic Stacker
  • Material: Coal

We started in this project with one mechanical site engineer and one electrical site engineer for Sandvik Mining. After 3 Month MCI began also with the Site Management for this Project in name of Sandvik. We build 2 Stacker with a theoretical capacity from approx. 6.500 To/H and 2 Reclaimer with the same capacity. We took over the whole responsibility in the mechanical and electrical supervision for the Erection, the Commissioning with the Automation, the Operator Training, hand over to the client and the contact to the Client VALE.

Sandvik decided MCI because of our very good relationship over the last years due to a lot of successful projects together. In 2016 the project was finished with a satisfactory of the client. Jobs and results like this are our passion and give us potential to move forward and grow.

WordPress Cookie Hinweis von Real Cookie Banner